One companybetween your drawingand your door.
VIA INDIGOS is a US based contract manufacturer in Cincinnati, Ohio. We manufacture custom components in India and deliver them to your door. We run tooling, PPAP Level 3, production, freight and customs.The next thing you touch is the part at your door.
Today, all you do is chase your suppliers.
And that math is 1 supplier. You have a list.
30+ years on your side of the desk.Now we run the other side.
The drawing comes in.
Part VI 2611 · Rev A · Sheet 1 of 1 · DFM reviewedRFQ in · VI 2611

Tooling built.
First shots proven.
Nothing ships
until you sign it off.
See it running on a real brake rotor program.
- Dimensional report 24 of 24 ✓
- Material certs Attached
- Process flow + PFMEA Attached
- Control plan Attached
- MSA studies Attached
If 1 part fails,
we can find
the other 8,399.
VI 2611 · LOT 07
| Trace checkpoint | Record | Qty | Initial |
|---|---|---|---|
| Incoming material identity | Heat matched to cert | 8,400 | AS |
| In process lot identity | Lot card maintained | 8,400 | RK |
| Final inspection sample | Report FIR 2611 07 | 32 pcs | KS |
| Nonconforming quantity | Segregated | 0 | KS |
| Released quantity | Lot L07 | 8,400 | KS |
Heat / lot identity verified against traveler. Qty recounted before release.
| Char. | Requirement | Result |
|---|---|---|
| C01 | Critical characteristic | ✓ Within spec |
| C03 | Datum relationship | ✓ Within spec |
| C07 | Surface / visual | ✓ Accept |
| C11 | Material identity | ✓ Verified |
Date: 08/08/26
| Lot / label match | ✓ | Quantity verified | ✓ |
| Preservation method | ✓ | Pack spec checked | ✓ |
Packed the way you signed off.
Photographed. Sealed. Gate out.


0.0 km · JNPT 41 km
Documents
Movement
Onto the vessel.
The route ends at your dock.
From your drawing
to your dock.
Nothing here is an average. Each number is the date we commit to in writing, and the date the weekly status is measured against. Compare it against what a China plus one move actually costs you.
The 3 questions
you have not asked yet.
What if the quality slips?
Nothing enters production until PPAP Level 3 is submitted and you have signed it, so your first run is never the experiment. Every lot then carries its heat number, its inspection record and the initials of the person who checked it. If something escapes, you get an 8D with the root cause in writing, traced back to the shift it came from.
Who owns the tooling?
You do. It is written in before any steel is cut, and the tool is yours outright on final payment. You approve it from photographs at T0, T1 and T2, not from a phone call. If you ever want that tool moved, to another plant or out of India, it moves. Nobody should be held by a piece of steel on somebody else's floor.
What if the tariffs move again?
Every quote breaks out duty, freight and the HTS code it assumes, so nothing hides inside 1 number. When a rate moves we re-run the landed cost that same week and send you the new figure with the changed line marked. India origin carries no Section 301. The full math sits on our China plus one page.

Built by insiders.
VIA INDIGOS was built for buyers who need ownership on the floor: engineering follow through, supplier execution, quality evidence, logistics, and clear status from drawing to delivery. More about how we work.