Where the chain breaks.And where we hold it.
On an assembly, the chain is longer and the breaks multiply: 13 sub suppliers means dozens of chances to drop the ball. We hold every one. Ten real stages, drawing to your dock. No sub-step skipped, no handoff left to chance.
01
Drawing + BOM intake
Break. Most suppliers quote the assembly without reading the BOM. Missing fastener specs and revision gaps surface at the bench.
Hold. BOM scrubbed line by line inside 48 hours. Every child part sourced, priced, or flagged in writing.
02
Quote + landed cost
Break. You get 13 separate quotes and nobody totals them. Duty, freight, and test charges arrive later and break the budget.
Hold. One number per assembled unit, with child parts, fixtures, testing, freight, duty, and inland all built in.
03
PO + program kickoff
Break. Kickoff drifts two weeks while each shop still confirms specs, and your schedule slips on day one.
Hold. Kickoff call inside 5 days of the PO, with the build schedule, sign offs, and names locked in writing.
04
Child part sourcing + tooling
Break. Every child part supplier starts on their own clock. The slowest one quietly sets your delivery date.
Hold. One build schedule. Every child part and tool tracked weekly against the same assembly date.
05
First article build
Break. Parts meet a bench for the first time in production. Stack up and fit problems are found at unit 1 of 5,000.
Hold. Complete FAI units built, measured, torqued, and function tested before production is released.
06
Incoming + kitting
Break. A superseded revision slips into the bins and is found at station 3, half built into 200 units.
Hold. Incoming inspection on every child part lot. Kits staged per unit with a traveler and revision check.
07
Assembly + torque control
Break. Torque set by feel and never recorded. The warranty claim lands on you 8 months later.
Hold. DC torque tools with logged values on every critical joint. Calibration certificates on file.
08
Functional test
Break. Assemblies ship on dimensional checks alone. The leak reaches your customer before it reaches a test rig.
Hold. Pressure decay, hydraulic leak, and function checks per the control plan. Results recorded per serial.
09
PPAP + quality release
Break. PPAP turns up half done with the child part records missing, and production gets released on a verbal nod.
Hold. Assembly level PPAP Level 3 with child part PPAPs rolled in. PSW signed by buyer before a single unit ships.
10
Customs + US delivery
Break. Wrong HS code, a duty surprise on the invoice, and demurrage running before anyone notices.
Hold. HS code locked at the quote, broker briefed, and container photos sent to you before the seal goes on.